For temporary protection of components from weather during construction

  • Slip-resistant
  • Fully adhesive
  • Waterproof
Execution
Total:
Roll
Product number: SW10019.4

  • Protection from moisture
  • UV acrylic adhesive
  • Transparent & anti-slip

Product advantages

Slotted liner 130/20

Slotted liner 130/20

Simplifies the processing

UV-Acrylat

UV acrylate

Extreme adhesive strength

Driving rain proof

Driving rain proof

Waterproof, protection from rain

✓

RELIABLE MOISTURE PROTECTION

Our self-adhesive ALMO Atacana construction period sealant reliably protects wooden elements from moisture and water ingress during the construction phase, transportation and storage. This prevents damage such as discoloration or material deformation due to swelling.

✓

OPEN TO DIFFUSION AND RAINPROOF

ALMO building waterproofing not only provides effective protection against water penetration, but also allows residual moisture to escape. This ensures optimum drying and prevents long-term moisture damage.

✓

UV ACRYLATE FOR EXTREME CONDITIONS

Thanks to the UV acrylate adhesive, the construction sealant remains strongly adhesive even in contact with moisture. Even in wet conditions, the adhesive retains its transparency and provides long-lasting protection, ideal for demanding construction environments.

✓

EASY HANDLING

Thanks to the non-slip, robust surface and the tear-resistant plastic liner, the construction time seal is particularly easy and safe to work with, even in wet conditions. It not only protects the material, but also provides safety for the workers during installation.

✓

TRANSPARENT FOR OPTIMUM VISIBILITY

With its transparent surface, the natural wood structure remains visible and factory markings or penetrations also remain clearly visible. This supports precise processing and simplifies installation.

Technical data

Application Construction time sealing
Coverage Tear-resistant plastic liner
Grammage 200g/m²
Carrier system Polypropylene fleece
Roll dimensions 50m x 37,5cm
Functional layer Slip-resistant and waterproof special coating
Fire behavior Fire class E (according to EN 13501-1)
Resistance to water penetration W1 (according to DIN 1928)
Diffusion-equivalent air layer thickness (sd value) 6m
Outdoor weathering 16 Weeks
Adhesive UV acrylate
Characteristics Translucent, finger lift, non-slip
Temperature resistance -40°C to +80°C
Processing temperature -5°C to +40°C

Installation instructions Atacana Weather protection membrane

Step 1

Step 1: Preparation of the substrate

Make sure that the substrate is clean, dry, free of dust and grease and not adhesive-repellent.

Step 2

Step 2: Positioning the construction time seal

Position the Atacana construction time waterproofing along the marked areas, such as the imprint or chalk line. Ensure an overlap of 15 cm, but at least 10 cm. Then roll the Atacana back again.

Step 3

Step 3: Preparing the separating strips

Peel off the wide release strip, starting at the slit, and lay it back along the roll. Roll back the Atacana construction sealant completely and rub it down well to ensure optimum adhesion.

Step 4

Step 4: Rolling out and fixing

Peel off the wide separating strip and roll out the Atacana onto the surface. Use a broom or squeegee to press it firmly onto the surface.

Step 5

Step 5: Secure overlaps

Again, ensure an overlap of 15 cm, but at least 10 cm. Remove the narrow separating strip and press the overlap thoroughly to ensure a tight seal.

Step 6

Step 6: Completing the installation

Check the installation to ensure that the Atacana construction time waterproofing is evenly and firmly applied to the substrate. If necessary, repeat the steps for optimum coverage.

Step 7

Step 7: Sealing connections

Carry out the connections on mineral substrates or wooden materials with Versa® Uni Tape 100 to ensure a reliable seal.

Our store ratings
Carrier system: Polypropylen-Vlies
Characteristics: Translucent, Fingerlift, Slip-resistant
Adhesive: UV-Acrylat
Cover: Tear resistant plastic liner
Functional layer: Special anti-slip and waterproof coating
Diffusion-equivalent air layer thickness (sd value): 6m
Outdoor weathering: 16 Weeks
Roll length: 50m
Width: 1,5m
Temperature resistance: -40 °C to +80 °C
Processing temperature: -5 °C to +40 °C
Fire behavior: Class E (according to EN 13501-1)

Reviews

1 of 1 reviews

5 out of 5 stars


100%

0%

0%

0%

0%


Leave a review!

Share your experiences with other customers.


26 September 2024

Lässt sich gut verarbeiten und hält auch

Lässt sich gut verarbeiten und hält auch bei Nässe. Bin zufrieden mit der Qualität